The wicked weather lately has slowed modelling right down. Apart from the noise from the wind and rain making shed-work unattractive, the damp atmosphere is preventing PVA from drying - so the ballasting of Login is taking much longer than expected.

However, I managed to make an engine shed for Cilgerran, on the Teifi Gorge layout, 'cos I could do that in the house. Then a break in the weather gave me the opportunity to do a quick bit of scenic work on the Cilgerran board. 25mm urethane foam covered with Modroc:


The hole in the middle is for the tunnel through the hill for the anticipated extension line to Newcastle Emlyn, which would go past Llechryd and Cenarth.
Here is the engine shed and retaining walls roughly plonked in place to give an idea of how it will look:


And a close up of the engine shed (needs gutters, downpipes, and a bit more weathering)

ATB
Shaun.