Yet another post! I'm really spoiling you lot these days...
This post isn't really about the ChufferDuffers - it's an update on the Heritage building. We had a scheduled painting day yesterday, and Pat, Thomas and myself joined Peter to put the final coat of paint on.
When we got to Login we found that Peter had already painted the third coat onto the front and also painted the doors and window frames. Just waiting for the window sills to come from Malvern Timber.
By twelve thirty we had finished the outside of the building:
This is the front - inside of the doors yet to do. You'll have to excuse the mess in these pictures, as it is work-in-progress at the moment.
This is the view taken from the parking area:
During the week Peter had the base units for the layouts arrive, as flat packs from Wickes. Also sheets of ply-wood for going down on the floor prior to carpet being laid.
The carpet is in the form of industrial grade carpet tiles, and they arrived while we were on hand to help off load.
A short break with coffee and cake kindly brought down to us by Dawn
Half an hour later the truck arrived with the polyurethane insulation for the inside walls, so there is nothing holding us back!
The ply sheets were laid on the floor with a nail gun, expertly wielded by Patrick (this is he, though not everybody would recognise him...)
In the opposite corner we have the carpet tiles, which will probably be the last item to go down:
And then after these pictures were taken the insulating panels arrived, and were stacked onto the floor at the far end:
Once the walls have been filled with insulation and lined with ply-wood, it will be back with the painting crew, and then the electrician can fit the trunking and light and power.
After that it will be carpet and base units.
There we go - up to date with the shed!
(notice I was very tactful and never said a word about Pat and the fruit cake...)