The weather held fair, so we were able to crack on with preparing the new building for the Cardi-Bach 'stuff'
We were expecting to carry on with painting the interior, but Pete had worked like a trojan through the week, and put several top-coats of cream onto the walls, so last night we concentrated on the carpet tiles and flat pack units.
Peter, Pat and Thomas worked inside fitting the carpet, whilst Colin and I were outside busy putting more of the kitchen units together. A bit cooler last night so we weren't bothered by the midges.
Between the five of us we managed three more units and covered all of the floor with the carpet tiles.
Colin and Pat putting the final edge pieces in:
Looking towards the door, with Pete and Thomas trying out topping for the units, and the guys from Allied Carpets busy on the edging:
And the view from the door looking down the length of the building, with Thomas checking for clearance behind the units, which will have the Cardi-Bach layouts sitting on top, and operated from behind.
After bit of a clear up, we were treated to Dawns Cakes, sausage rolls and crisps, and beverages of choice. Many thanks to Peter for his hospitality!
Next posting won't be for a couple of weeks, as we are off to Ireland for a few days.
Slainte,
Shaun.
No comments:
Post a Comment